This week involved another meeting with Hank. He reviewed all our section details and outlined what was wrong or needed for each detail to be finalised. He also asked some of us to work on various unfinished details of the bus stop such as:
- the sliding door mechanism
- Minitec frame built into bus stop
- connections between roof and back wall
No comments:
Post a Comment