This week again involved meeting with Hank to finalise any questions. This meeting was also our last before our final group presentation.

He outlined that he wanted finalised section drawings as well as 1:1 models of those sections.

Sections that I had been working on since the last individual submission were sections 2 and 6.

The placement of these section are outlined as shown below in the figure:



Due to the fact that Section 6a and 6b were similar I decided to work with Jason Lo (who did section 6b) in order to create an in depth physical model.

6a and 6b section drawing by Hank (very similar):



I went about working on finalising the section 6 detail way past what was expected of hank. I placed the mintec profile in the correct place with the correct dimensions of 30mm x 30mm. I also added the screws, bolts, nuts and angle connector that would all be used in conjunction to connect the roof and back wall together.

The video below is the proof of progress: